Townhomes III Paint

Independence Townhomes III

2022 Exterior Repainting Project

Project guidance for Townhomes III homeowners as building exteriors are repaired, protected, and repainted on the association reserve schedule.

View color schemes

Let's Get Colorful

Regular exterior repainting is part of the Independence Townhomes III Association's responsibility to preserve building condition, appearance, and long-term value. The project includes preparation, repair, protection, painting, and punch-list review.

Most units will be repainted in their current color family, while some buildings will receive adjustments intended to improve durability, visual balance, and community consistency.

Resident Preparation

What We Need From You

Projects of this size and scope require homeowner cooperation. Residents will receive communication from management and door notices when their building is preparing to be painted.

Exterior furniture, decorations, and storage items

Remove furniture, plants, decorations, grills, rugs, and storage items from front and rear exterior areas before your building is painted.

Exterior doors

Front doors, lanai doors, and garage doors are included. Crews may need access around door frames, and residents will be notified when access is needed.

Driveway parking

Park away from driveways while your building is active to reduce overspray risk and allow crews to reach garage doors and walls.

Screen enclosures

Panels may be removed where needed and restored after painting. Please be prepared for crews to work around enclosed patios or lanais.

Pets and kids

Use caution around active work areas. Paint dries quickly, but exterior areas should be treated as work zones until crews have completed and cleared them.

Painted patio and lanai floors

If your patio or lanai floor is painted concrete, remove all items so it can be repainted as part of the project.

Independence homes near community landscaping

Building Colors and Schedule

Building colors

Building color information is available by address. Most homes remain close to their prior scheme, with selected modifications where needed for a more durable and coordinated finished result.

Open color scheme PDF

Painting schedule

Buildings are painted in small groups to protect quality workmanship. The first buildings in the sequence were 21 and 20 on Avenue of the Arbors facing Independence Elementary, with additional groups following as work progresses.

The Painting Process

Pressure Washing

Buildings are cleaned to remove accumulated dirt, mold, and mildew.

Repairing

Crews inspect stucco and repair cracks or fissures before paint is applied.

Taping & Protecting

Windows, fixtures, screen panels, and details are protected before painting begins.

Repainting

Paint is applied with sprayers and rollers in multiple coats where needed.

Punch List

The Board and management team inspect completed work and identify contractor follow-up items.

Project Communication

If you have questions about your unit, contractor access, or project timing, contact the management team so concerns can be routed to the appropriate project coordinator.