Independence Townhomes I

2023 Re-Roofing Project: Phase 2.1

Project information for Townhomes I homeowners while the association replaces roof systems nearing the end of their service life.

View project map

Let's Raise (and Replace) the Roof

One of the Independence Townhomes I Association's responsibilities is replacing building roof systems on a reserve schedule. Most Townhomes I units are approaching the end of the design lifespan for their current roofs, so this phase moves that work forward building by building.

The association and contractor team will coordinate schedules, access, equipment, and resident communication throughout the project. Weather, safety, and material conditions may affect daily timing.

Buildings Included in This Phase

Weather permitting, this project is expected to take approximately 6 to 8 weeks from start to completion. Each building will take several days, and crews may work on more than one building at a time.

DurationApproximately 6 to 8 weeks once work begins.
Work patternSeveral days per building, with multiple buildings active when appropriate.
MapOpen the roofing phase map for the included addresses.

Resident Preparation

What We Need From You

A project of this size depends on homeowner cooperation. Please prepare the inside and outside of your home before crews arrive so work can proceed safely and efficiently.

Roofing is noisy.

Roof removal and replacement will create rattling, vibration, and sustained noise inside homes. Please plan for disruption while your building is active.

Prepare interior and exterior items.

Take down valuable framed artwork, delicate wall items, fragile items on shelves or pedestals, and anything else that could be affected by vibration. Clear exterior areas that may interfere with ladders, materials, or worker access.

Solar panels and satellite dishes must be removed.

Homeowners are responsible for removing roof-mounted solar arrays or satellite dishes before roofing work. The association will not remove those items, and work may be delayed or extra costs may apply if they remain in place.

Parking and traffic will be impacted.

Expect dumpsters, materials, heavy equipment, contractor vehicles, and workers near active buildings. Allow extra time and avoid parking where crews need access.

Tree work will happen before roofing.

Tree trimming will take place ahead of the roofing work to provide better access to roofs and work areas.

Independence community homes and landscaping

Thank You for Your Patience

The roof system is one of the most critical parts of each building. The Board, management team, and contractor appreciate resident patience while the work is completed safely and correctly.